PrevNext Project: Ground Slab Pre-Pour Inspection Location: Welshpool, City of Canning September 26, 2015 Site Inspections Related projects Stair and Suspended Slab Reinforcement Pre-Pour Inspection September 26, 2015 Site InspectionsDetails Steel Frame Inspection September 26, 2015 Site InspectionsDetails Soil and Wind Site Classification for New Foundation Design September 26, 2015 Site InspectionsDetails Soil and Wind Site Classification September 26, 2015 Site InspectionsDetails Earthworks Compaction Testing September 26, 2015 Site InspectionsDetails Slab Load Certification (Concrete Core Drilling, Material Testing and Soil Compaction) September 26, 2015 Site InspectionsDetails Earthworks Compaction Testing using the Perth Sand Penetrometer (PSP) September 26, 2015 Site InspectionsDetails Footing Pre-Pour Inspection September 26, 2015 Site InspectionsDetails Suspended Slab Pre Pour Reinforcement Inspection September 26, 2015 Site InspectionsDetails